CityWA
Posted
Jul 13, 2026
Nov 25, 2026
Grass Valley Fire Station 42 MEP Improvements *Re-bid* RFP
Replace the building's mechanical equipment and plumbing fixtures that are at the end of their serviceable life with new equipment. Install a new source capture system and a new energy recovery ventilation system with distribution to new air handlers. Install a new building automation system. Electrical work consists of disconnection and reconnection of replaced mechanical equipment and upgrade to circuits and wiring as necessary. In addition to MEP-related work, perform specified demolition of existing half-height mezzanine wall within the fire station's apparatus bay to reconstruct the wall, providing a fully enclosed mezzanine space. There is an additive alternate for siding review and repairs.
