Bullitt Hills and Hillview #1 WWTP Eliminations

Description: Work include 175 LF 8" SDR 35 PVC Gravity Sewer 175; 950 LF 12" SDR 35 PVC Gravity Sewer; 1000 LF 15" SDR 35 PVC Gravity Sewer; 300 LF 18" SDR 35 PVC Gravity Sewer; 425 LF Minimum 54" Steel Casing Pipe - Installed via Trenchless; 125 LF 24" Steel Casing Pipe - Installed via Bore and Jack Method; 125 LF 6" DR18 PVC Force Main (Preston Village Extension); 25 LF 8" DR18 PVC Force Main (Tanyard Springs #1 Extension) 25; 325 LF 8" DR18 PVC Force Main (Tanyard Springs #1 Extension) 25; 5800 LF 14" DR18 PVC Force Main. See attached file for more.

Released
Jun 29, 2026
Closes
Aug 18, 2026(Closed)