CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Central Resort District Drainage Improvements Phase 1 Design Build Project (Request For Proposal)
Design-Build: work includes central resort district drainage improvements.
Description: Provide wwtp improvements project- phase 1.
HigherEducation · TX, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Texas A&M University.
Adjacent opportunities open for bidding right now.
CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Design-Build: work includes central resort district drainage improvements.
CityCA
Posted
Sep 17, 2026
Oct 16, 2026
Provide traffic engineering and civil design services in association with the systematic traffic signals improvements project.
CityTX
Posted
Aug 31, 2026
Oct 22, 2026
Work shall include all civil, architectural, structural, mechanical, hvac, electrical and instrumentation work; package plant modifications; package plant blowers modifications; headworks and influent lift station modifications; new grit removal facility; aeration splitter box expansion; construction of two (2) additional chambers at the aeration splitter box is not included in the base bid and shall be performed only if alternate no. 2 is accepted by the owner. ; new aeration basins with 2 treatment trains; blower building modifications, including structural, architectural, hvac, mechanical, electrical and instrumentation. See attached file.
CountyTX
Posted
Sep 8, 2026
Oct 15, 2026
Provide reconstruction of west county road. 1,131 LF sawcut existing asphalt and concrete (full depth); 923 CY asphalt excavation - 1.0 inch depth (average); 923 CY asphalt haul off; 14,786 CY earthwork; 14,786 CY haul off; 43,064 SY subgrade preparation (roadway). See attached file.