West Virginia Department of Administration
State AgencyWV
Posted
Oct 20, 2026
Dec 8, 2026
Building 29 Hangar Renovations RFP
Hangar renovations.
Description: The West Virginia Purchasing Division is soliciting bids on behalf of the West Virginia Department of Administration, General Services Division, to establish a contract for renovations to Building 29 Hangar in Charleston, West Virginia. The Project Manual and Drawings may be obtained from the project engineer or Charleston Blueprint. A mandatory pre-bid meeting is scheduled for November 17, 2026, at 11:00 a.m. EST.
StateAgency · WV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from West Virginia Purchasing Division.
Adjacent opportunities open for bidding right now.
West Virginia Department of Administration
State AgencyWV
Posted
Oct 20, 2026
Dec 8, 2026
Hangar renovations.
CityCT
Posted
Jun 16, 2026
Oct 27, 2026
Work includes renovation site is a four-floor building. The prospect shelter occupies floors one and two and new prospects is on floor three and four. Each floor will have renovations done to upgrade them to improve safety, energy efficiency, and the general environment including;furnish and install 106 led 2' x 4' drop ceiling ljghts throughout the building: approximately 22 recessed units and 84 flush mounted units 26,500. ; kitchen install 5pc. 4' x 8' fire rated panel wall covering compound/sand/paint entire room; medical room 1 & 2, replace drop ceiling with new armstrong 24"x24" acoustic tiles and grid compound/sand/paint entire room. ; furnish and install four new front entrance treads with new rubber treads. See attached file.
Pennsylvania Department of General Services
State AgencyPA
Posted
-
Nov 10, 2026
The Pennsylvania Department of General Services requests proposals for general, HVAC, and electrical construction for the Keystone Building CMS renovations. The posting estimates general and electrical construction at $4 million–$5 million each and HVAC construction at $2 million–$3 million. A pre-proposal conference is scheduled for October 16, 2026, at the Keystone Building in Harrisburg.
CityCT
Posted
Sep 28, 2026
Oct 27, 2026
Work includes apply compound, sand and repaint on all walls in laundry room; install fire rated walls in kitchen, and apply compound, sand, and paint; furnish and install new floors throughout prescribed areas; repair the damaged and broken stair components; provide and install rubber stair treads, 36" x 12", black, heavy-duty commercial grade, with slip resistant/nonskid surface. Treads shall be durable, resilient, and suitable for high-traffic interior stairways. Install securely over clean, sound stair surfaces using manufacturer-recommended adhesive and installation methods. Include all necessary adhesives, accessories, cutting, fitting, and labor for a complete installation on all stairs from 1st floor to stair leading to roof. See attached file.