Brunswick-Glynn Joint Water And Sewer Commission
Special DistrictGA
Jul 29, 2026
Closes
Sep 1, 2026
Description: Procurement of professional land surveying services for proposed water main improvements, including right-of-way and existing conditions surveys, along Belle Cutoff Road, Dusty Lane, and Cedardale Road in Glynn County, Georgia.
SpecialDistrict · GA, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Brunswick-Glynn Joint Water And Sewer Commission.
Adjacent opportunities open for bidding right now.
Brunswick-Glynn Joint Water And Sewer Commission
Special DistrictGA
Jul 29, 2026
Closes
Sep 1, 2026
This Invitation for Bid (IFB) is for construction services involving the installation of approximately 3,873 linear feet of 12-inch water main and 943 linear feet of 8-inch gravity sewer main.
FederalVA
Aug 10, 2026
Closes
Sep 10, 2026
Removal and installation of 12 new water meters.
CityTX
Mar 31, 2026
Closes
Mar 31, 2031
The City of Burleson is soliciting qualifications to pre-qualify architectural, engineering, surveying, and right-of-way acquisition firms licensed in Texas for on-call professional services. Qualified firms will be placed on a pre-qualified list for project-specific work over a five-year period from April 1, 2026, through March 31, 2031. Submissions must be made through the City's procurement portal, and placement on the list does not guarantee a contract award.
FederalDC
Aug 7, 2026
Closes
Sep 15, 2026
This project involves installing a new 2" HDPE waterline beneath Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.