Posted
Aug 28, 2026
Sep 18, 2026
Michael Rigby Post Frame Building
Construction of a 40 ft by 64 ft with a 12 foot ceiling height (2560 SF) post frame building.
Description: Construction of a 42' x 48' timber column structure complete with all appurtenances. Base Bid price shall be provided along with alternate, for Interior Finishes.
City · IL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Aug 28, 2026
Sep 18, 2026
Construction of a 40 ft by 64 ft with a 12 foot ceiling height (2560 SF) post frame building.
CitySD
Posted
Aug 14, 2026
Sep 23, 2026
Construction of a new 50' x 80' x 18' post-frame (pole) building. The proposed building shall include, at a minimum: Dimensions: 50' x 80'. 18' sidewall height. One 24' x 16' overhead door located on the front, offset to the right side. One standard walk-through entry door. Metal roof and metal wall siding. No windows.
Louisiana Division of Administration
State AgencyLA
Posted
Aug 13, 2026
Sep 15, 2026
Provide city park maintenance complex improvements equipment storage building.
CityTX
Posted
Aug 25, 2026
Sep 30, 2026
General construction of a new pre-engineered metal storage building. The building with a new restroom area made of metal stud framed walls with gypsum board finished walls and ceilings. There will also be a striped concrete area for handicapped parking next to the new pre-engineered metal building. The project also provides for concrete flatwork, parking striping and stubbed out plumbing connection for a prefabricated office building not in this contract. The ADA ramp to this building is also not in this contract.
Decision makers connected to this RFP from Bruce Township.