Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the construction of the foundations and utilities for the new restroom building, installation of the restroom building, concrete walkway, asphalt walkway, utilities, and other incidental items. Principal items of work in the project include: 1 LS supply & install 12' x 28' prefab restroom building; 1 LS electrical service and all electrical work, including electrical connection, 2.5" electrical conduit & minimum #1 awg cu conductors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design and construction of a new restroom building at Hill Street Park for the City of North Myrtle Beach.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Design and construction of a new restroom building at Hill Street Park for the City of North Myrtle Beach.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide reroofing services for two existing park restroom buildings as part of an effort to address aging roof systems and ensure safe, durable facilities for continued public use.
Posted Date
Jan 6, 2026
Due Date
Feb 20, 2026
Release: Jan 6, 2026
Close: Feb 20, 2026
Provide reroofing services for two existing park restroom buildings as part of an effort to address aging roof systems and ensure safe, durable facilities for continued public use.
AvailableThe project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
Posted Date
Dec 14, 2025
Due Date
Feb 3, 2026
Release: Dec 14, 2025
Close: Feb 3, 2026
The project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
AvailableWork includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Work includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →