Alabama Department of Transportation
Special DistrictAL
Posted
Aug 1, 2026
Sep 25, 2026
Description: Work inlcudes 275 SY removing concrete driveway; 307 LF removing pipe; 1,863 LF removing guardrail; 171 LF removing concrete flume; 6 EA removing headwalls; 4 EA removing guardrail end anchor (all type); 28,468 CY unclassified excavation; 125,465 CY borrow excavation; 607 CY borrow excavation (underwater backfill); 1,099 CY borrow excavation (underwater embankment); 9,100 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness; 30,540 SY bituminous treatment a. See attached file.
SpecialDistrict · AL, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Alabama Department of Transportation.
Adjacent opportunities open for bidding right now.
Alabama Department of Transportation
Special DistrictAL
Posted
Aug 1, 2026
Sep 25, 2026
Work includes approx 66,931 CY borrow excavation; 58,710 SY micro-milling existing pavement; 1 LS brdge concrete superstructure; 17,461 SY grooving concrete bridge decks; 3,378 LF 18" roadway pipe (class 3 RC); 1,384 LF 18" storm sewer pipe (class 3 RC); 248 LF 24" roadway pipe rehabilitation.
Alabama Department of Transportation
Special DistrictAL
Posted
Aug 29, 2026
Sep 25, 2026
Work includes clearing and grubbing, 2,335 CY unclassified excavation, 8,332 CY borrow excavation (a4 or better), 362 CY borrow excavation (underwater embankment), 3,379 CY structure excavation, 406 CY foundation backfill, commercial (aldot #1 stone), 572 CY foundation backfill, commercial (aldot #467 or aldot #57 stone), 226 Ton roadbed stabilizing material, aldot #467, 534 SY bituminous treatment a, 484 Gal tack coat, 2,500 SY planing existing pavement (approx 1.0" thru 2.0" thick), material remixing device, superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, esal range a/b 141 Ton. See attached file.
Alabama Department of Transportation
Special DistrictAL
Posted
Aug 28, 2026
Sep 25, 2026
Work includes clearing and grubbing, removal of old bridge, removal of old box culvert, 1,049 SY removing concrete driveway, 1,643 LF removing pipe, 526 LF removing guardrail, 1,858 LF removing curb, 1,216 LF removing curb and gutter, 1,703 LF removing concrete flume, 4,999 LF removing fence, 12 EA removing headwalls, 14 EA removing inlets, removing junction boxes, 8 EA removing guardrail end anchor, 60,052 CY unclassified excavation, 5,200 CY muck excavation, 228 rbst roadbed processing, 2,300 SY geosynthetic reinforcement for soft soil stabilization, type 2, 118,514 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness. See attached file.
Illinois Department of Transportation
State AgencyIL
Posted
-
Sep 18, 2026
Construction of a two-span IL-Beam bridge with concrete deck to carry road over creek. Includes raising roadway profile, HMA roadway construction and guardrail. See attached files and outside link.