Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
AvailableThe City of Winston-Salem seeks a qualified firm to provide professional consulting services to design the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek. The project is partially reimbursed with Federal-aid funding through NCDOT and includes design of a two-span bridge with two 12-foot vehicle lanes, bicycle lanes, sidewalks, ADA accommodations, greenway accommodation, and associated roadway, utility, permitting, traffic control and public outreach tasks. The anticipated contract time is approximately nine months from Notice to Proceed, with design milestones and a required public engagement meeting at the 30% design stage.
Posted Date
Dec 15, 2025
Due Date
Jan 17, 2026
Release: Dec 15, 2025
Close: Jan 17, 2026
The City of Winston-Salem seeks a qualified firm to provide professional consulting services to design the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek. The project is partially reimbursed with Federal-aid funding through NCDOT and includes design of a two-span bridge with two 12-foot vehicle lanes, bicycle lanes, sidewalks, ADA accommodations, greenway accommodation, and associated roadway, utility, permitting, traffic control and public outreach tasks. The anticipated contract time is approximately nine months from Notice to Proceed, with design milestones and a required public engagement meeting at the 30% design stage.
AvailableProvide Professional consulting services to design the replacement. replacement project which will include a new two span bridge with two 12’ lanes of travel for vehicles, two 5’ bicycle lanes, a 2’ buffer between the vehicle and bicycle lanes, two 6’ sidewalks with curb, and a black two-bar metal barrier rail.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
Provide Professional consulting services to design the replacement. replacement project which will include a new two span bridge with two 12’ lanes of travel for vehicles, two 5’ bicycle lanes, a 2’ buffer between the vehicle and bicycle lanes, two 6’ sidewalks with curb, and a black two-bar metal barrier rail.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →