Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation and development of the Brewery Wellfield, including drilling, installing, and testing two 400-foot deep, large-diameter test wells, and potentially a third test well, to achieve a combined production capacity of at least 4,343 gallons per minute.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
100 LF install sanitary seal, 440 LF well seal drilling, 540 LF well seal installation, 2 EA plumbness and alignment testing of 16" casing, 260 LF 16" drilling, 2 EA video inspection.
Posted Date
Nov 28, 2025
Due Date
Jan 16, 2026
Release: Nov 28, 2025
Close: Jan 16, 2026
100 LF install sanitary seal, 440 LF well seal drilling, 540 LF well seal installation, 2 EA plumbness and alignment testing of 16" casing, 260 LF 16" drilling, 2 EA video inspection.
AvailableWork includes se wellfield expansion.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
Work includes se wellfield expansion.
AvailableTo replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
Posted Date
Nov 25, 2025
Due Date
Feb 18, 2026
Release: Nov 25, 2025
Close: Feb 18, 2026
To replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
AvailableThe City of Palm Coast is issuing an RFI to identify experienced craft brewery operators to establish an anchor brewery and taproom within The Promenade at Town Center, a mixed-use development. The RFI describes required operational experience (brewery and optional food service), the space sizes (approx. 5,250 sq ft taproom and 5,225 sq ft enclosed food court), and anticipates The Promenade opening mid-2026. Proposals/intent to bid are due February 5, 2026; questions due January 26, 2026.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
The City of Palm Coast is issuing an RFI to identify experienced craft brewery operators to establish an anchor brewery and taproom within The Promenade at Town Center, a mixed-use development. The RFI describes required operational experience (brewery and optional food service), the space sizes (approx. 5,250 sq ft taproom and 5,225 sq ft enclosed food court), and anticipates The Promenade opening mid-2026. Proposals/intent to bid are due February 5, 2026; questions due January 26, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis