Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
100 LF install sanitary seal, 440 LF well seal drilling, 540 LF well seal installation, 2 EA plumbness and alignment testing of 16" casing, 260 LF 16" drilling, 2 EA video inspection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
To replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
Posted Date
Nov 25, 2025
Due Date
Feb 18, 2026
Release: Nov 25, 2025
Close: Feb 18, 2026
To replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
AvailablePremium
Access the largest public sector contact database
The project is a Community Development Block Grant program project and involves the installation of approx. 7,900 LF of a six-foot (6ft.) wide sidewalk system. The project consists of general construction activities associated with sidewalk installation. The project specifically addresses a lack of sidewalks within a geographical area of the city.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
The project is a Community Development Block Grant program project and involves the installation of approx. 7,900 LF of a six-foot (6ft.) wide sidewalk system. The project consists of general construction activities associated with sidewalk installation. The project specifically addresses a lack of sidewalks within a geographical area of the city.
AvailableThe project includes the following work: Drill pilot holes and drill, construct, and test two alluvial wells (W-2 and W-3) to a depth of approx 200 FT below ground surface (bgs).
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
The project includes the following work: Drill pilot holes and drill, construct, and test two alluvial wells (W-2 and W-3) to a depth of approx 200 FT below ground surface (bgs).
AvailableThe City of Palm Coast issued ITB-UT-26-07 for the WTP #1 Wellfield Expansion to furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main, including three directional drills, valves, connections, restoration, the equipping of two potable water supply wells, and providing two generators. Submissions are managed through the City’s Bonfire portal and require the listed forms, bid security, licenses, and signed addenda as applicable. The opportunity opened Nov 12, 2025 and closes Dec 18, 2025; questions were due Dec 9, 2025 and an Intent to Bid is due Dec 17, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
The City of Palm Coast issued ITB-UT-26-07 for the WTP #1 Wellfield Expansion to furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main, including three directional drills, valves, connections, restoration, the equipping of two potable water supply wells, and providing two generators. Submissions are managed through the City’s Bonfire portal and require the listed forms, bid security, licenses, and signed addenda as applicable. The opportunity opened Nov 12, 2025 and closes Dec 18, 2025; questions were due Dec 9, 2025 and an Intent to Bid is due Dec 17, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis