Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes bridge and paving improvements.
Posted Date
Dec 9, 2025
Due Date
Feb 12, 2026
Release: Dec 9, 2025
Close: Feb 12, 2026
Work includes bridge and paving improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 8 EA bridge repair remove and replace timer cap; 9 EA bridge repair remove and replace timer stringer; 16 EA bridge repair remove and replace timer pile; 23,210 SF bridge repair remove and replace timer decking with composite decking; 3,832 bridge repair remove and replace timer rail cap with composite rail cap; 14,500 LF bridge repair remove and replace timer railing with treated railing.
Posted Date
-
Due Date
Feb 10, 2026
Release: -
Close: Feb 10, 2026
Work includes 8 EA bridge repair remove and replace timer cap; 9 EA bridge repair remove and replace timer stringer; 16 EA bridge repair remove and replace timer pile; 23,210 SF bridge repair remove and replace timer decking with composite decking; 3,832 bridge repair remove and replace timer rail cap with composite rail cap; 14,500 LF bridge repair remove and replace timer railing with treated railing.
AvailableThe Hillsborough County Board of County Commissioners issued an IFB for rehabilitation of Bridge No.100026 (Morris Bridge Rd over the Hillsborough River) to mitigate scour risk and repair deteriorated bridge elements. Work includes installation of an articulating concrete revetment system for scour countermeasures and miscellaneous bridge repairs such as spall and joint repairs and slope protection, with an estimated value of approximately $1.1M. The contract is expected to commence on issuance of the Notice to Proceed and be completed within 360 days, and bids are due March 13, 2026 at 2:00 PM EDT.
Posted Date
-
Due Date
Mar 13, 2026
Close: Mar 13, 2026
The Hillsborough County Board of County Commissioners issued an IFB for rehabilitation of Bridge No.100026 (Morris Bridge Rd over the Hillsborough River) to mitigate scour risk and repair deteriorated bridge elements. Work includes installation of an articulating concrete revetment system for scour countermeasures and miscellaneous bridge repairs such as spall and joint repairs and slope protection, with an estimated value of approximately $1.1M. The contract is expected to commence on issuance of the Notice to Proceed and be completed within 360 days, and bids are due March 13, 2026 at 2:00 PM EDT.
AvailableGrading, Bituminous Milling, Concrete & Bituminous Surfacing, Unbonded Concrete Overlay and Bridge No. 26801, 26802, 26803
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Grading, Bituminous Milling, Concrete & Bituminous Surfacing, Unbonded Concrete Overlay and Bridge No. 26801, 26802, 26803
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →