Carlotta Road Pump Station Upgrade RFP
Upgrade of the Carlotta Road Pump Station, including replacement of pumping, electrical, and related site infrastructure.
Description: Work inlcudes replacement of the existing gas meter, modifications to high- pressure gas piping, installation of odorizer supply and injection piping, installation of a new odorizer and concrete foundation, installation of electrical conduit and wiring, installation and integration of the scada system, required radiographic and pressure testing, commissioning, site restoration, and associated appurtenances.
City · MS, US
Adjacent opportunities open for bidding right now.
Special DistrictFL
Posted
-
Dec 1, 2026
Upgrade of the Carlotta Road Pump Station, including replacement of pumping, electrical, and related site infrastructure.
CityLA
Posted
-
Dec 1, 2026
Upgrade of the existing sewer lift stations. These upgrades include demolition of both wet well tops on the existing lift stations, removal of pumps, controls, and discharge piping, and the construction of new wet well rcp extensions, reinforced concrete tops, valve boxes, discharge piping, pumps, control panels, radio communication, new electrical service, sewer manhole rehab, and site improvements as appropriate for complete and operational systems.
Muscogee County School District
School DistrictGA
Posted
Nov 18, 2026
Jan 5, 2027
We are seeking a General Construction Contractor to serve as the Construction Manager for this Project. The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer (the Construction Manager at Risk (CM)) shall serve as the general construction contractor and construction manager for the Project. The Project will include demolition and new construction to replace our existing Gasoline and Diesel Fuel Station buildings and canopies, removing and replacing all existing underground Gasoline and Diesel fuel storage tanks and associated existing fuel pumps, and upgrading or replacing of the existing Digital Transaction Fueling Control-Record System at our Whitesville Plant Services Facilities, as our budget permits. and will include all Construction Trades. The services will consist of cost estimating, constructability analysis and scheduling and phasing of the work. The CM will assist the School District and the Project Engineer in finalizing the phasing and scheduling of the work, and cost estimating and value engineering of the Project.
Posted
-
Dec 10, 2026
The Regional Municipality of Waterloo (the “Region”) is seeking a Consulting Engineering Firm (the “Consultant”) to provide professional services for: GRT Fairway Station Upgrade project at 300 Fairway Road South in the City of Kitchener.
Decision makers connected to this RFP from City of Batesville.
Solicitation files and supporting documents for this bid.