CityMS
Posted
Nov 12, 2026
Dec 15, 2026
Brewer Road Gate Station Upgrade RFP
Work inlcudes replacement of the existing gas meter, modifications to high- pressure gas piping, installation of odorizer supply and injection piping, installation of a new odorizer and concrete foundation, installation of electrical conduit and wiring, installation and integration of the scada system, required radiographic and pressure testing, commissioning, site restoration, and associated appurtenances.
