Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Chilled water optimization project. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chilled water loop upgrades.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Chilled water loop upgrades.
AvailableThis RFP is for construction services for the FY25 Cath Lab #3 Replacement at the Frankel Samuel and Jean Cardiovascular Center.
Posted Date
Jan 12, 2026
Due Date
Feb 6, 2026
Release: Jan 12, 2026
Close: Feb 6, 2026
This RFP is for construction services for the FY25 Cath Lab #3 Replacement at the Frankel Samuel and Jean Cardiovascular Center.
AvailableUniversity of South Carolina - Sumter seeks qualifications from architectural and engineering firms to improve the efficiency and interconnectivity of chilled water loops across campus as described in its Utility Master Plan. Scope includes hydraulic modeling, underground utility pipe design, adding heat exchangers, upgrading loop control systems, and replacing secondary/tertiary chilled water valves to optimize flow. The anticipated construction cost range is up to $3,470,500 and the project is expected to follow a Design-Bid-Build delivery method.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
University of South Carolina - Sumter seeks qualifications from architectural and engineering firms to improve the efficiency and interconnectivity of chilled water loops across campus as described in its Utility Master Plan. Scope includes hydraulic modeling, underground utility pipe design, adding heat exchangers, upgrading loop control systems, and replacing secondary/tertiary chilled water valves to optimize flow. The anticipated construction cost range is up to $3,470,500 and the project is expected to follow a Design-Bid-Build delivery method.
AvailableProvide place chilled water pumps on epower. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Close: Feb 6, 2026
Provide place chilled water pumps on epower. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis