Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
University of South Carolina - Sumter seeks qualifications from architectural and engineering firms to improve the efficiency and interconnectivity of chilled water loops across campus as described in its Utility Master Plan. Scope includes hydraulic modeling, underground utility pipe design, adding heat exchangers, upgrading loop control systems, and replacing secondary/tertiary chilled water valves to optimize flow. The anticipated construction cost range is up to $3,470,500 and the project is expected to follow a Design-Bid-Build delivery method.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Chilled water loop upgrades.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Chilled water loop upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Good hope station chilled water conversion the project consists of the demolition of the existing chiller system and associated components. Installation and integration of a new township procured trane chiller system upgrade.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Good hope station chilled water conversion the project consists of the demolition of the existing chiller system and associated components. Installation and integration of a new township procured trane chiller system upgrade.
AvailableProvide upgrade station chilled water for P&ID.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Provide upgrade station chilled water for P&ID.
AvailableWater treatment plant solids upgrades.
Posted Date
Dec 30, 2025
Due Date
Feb 2, 2026
Release: Dec 30, 2025
Close: Feb 2, 2026
Water treatment plant solids upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →