CityGA
Aug 3, 2026
Closes
Sep 8, 2026
Broad Street Water Main Replacement (AFB) -*REBID*
Installation of approx 2,300 LF of 6" water main pipe along street. The water main will connect to existing water mains. Cap existing 2" water main along street and abandon in place. Installation of water service laterals and make connection to 44 existing water meters; removal and replacement of existing pavement sections impacted by construction activities; installation of a new asphaltic concrete overlay along street; miscellaneous task such as excavation, backfilling, traffic control, and any other necessary work to complete the project. 50 LF 4" sewer lateral replacement, 100 LF 12" bituminous coated steel casing, 1 LS 2" water main plug and abandon, 20 SY sidewalk, erosion control, 200 SY grassing, fertilizing and mulching.