Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Oak Lodge Water Services District
Perform exterior concrete roof and exterior wall preparation and application of a roof coating on two 5-MG potable water reservoir. The roof area for each is approx. 21,362 SF and 1' vertical band around exterior wall 502 SF totaling 43,728 SF for both reservoirs. Work includes cleaning and surface preparation of the concrete roof and exterior wall, repair of cracks and concrete deficiencies that may contain or allow the intrusion of contaminants, and application of Sherwin Williams Loxon Acrylic in accordance with manufacturer recommendations and applicable standards.
Posted Date
Jun 8, 2026
Due Date
Jun 25, 2026
Release: Jun 8, 2026
Oak Lodge Water Services District
Close: Jun 25, 2026
Perform exterior concrete roof and exterior wall preparation and application of a roof coating on two 5-MG potable water reservoir. The roof area for each is approx. 21,362 SF and 1' vertical band around exterior wall 502 SF totaling 43,728 SF for both reservoirs. Work includes cleaning and surface preparation of the concrete roof and exterior wall, repair of cracks and concrete deficiencies that may contain or allow the intrusion of contaminants, and application of Sherwin Williams Loxon Acrylic in accordance with manufacturer recommendations and applicable standards.
AvailableOak Lodge Water Services District
Pipe burst approx. 2,315 LF of sewer pipe, replace lateral in right-of-way and manholes between Southeast Naef Road and Southeast Jennings Avenue on the east side of Southeast Mcloughlin Boulevard includes 2,315 LF mainline video inspection, 52 EA service lateral video inspection, 84 LF 8" PVC D3034 sanitary sewer pipe 10-foot depth, 1,011 LF sanitary sewer lateral 4", 48 EA cleanout 4", 2 EA rehabilitate existing manhole non-structural lining (as needed), 2 EA rehabilitate existing manhole minor rim adjustment (as needed), 2 EA rehabilitate existing manhole minor grout work (as needed), 2 EA rehabilitate existing manhole, replace frame and cover (as needed).
Posted Date
May 1, 2026
Due Date
May 21, 2026
Release: May 1, 2026
Oak Lodge Water Services District
Close: May 21, 2026
Pipe burst approx. 2,315 LF of sewer pipe, replace lateral in right-of-way and manholes between Southeast Naef Road and Southeast Jennings Avenue on the east side of Southeast Mcloughlin Boulevard includes 2,315 LF mainline video inspection, 52 EA service lateral video inspection, 84 LF 8" PVC D3034 sanitary sewer pipe 10-foot depth, 1,011 LF sanitary sewer lateral 4", 48 EA cleanout 4", 2 EA rehabilitate existing manhole non-structural lining (as needed), 2 EA rehabilitate existing manhole minor rim adjustment (as needed), 2 EA rehabilitate existing manhole minor grout work (as needed), 2 EA rehabilitate existing manhole, replace frame and cover (as needed).
Oak Lodge Water Services District
Demolish an abandoned buried chlorine contact tank and construct a tertiary treatment facility in the resulting open site at the wastewater treatment plant.
Posted Date
Oct 27, 2025
Due Date
Dec 11, 2025
Release: Oct 27, 2025
Oak Lodge Water Services District
Close: Dec 11, 2025
Demolish an abandoned buried chlorine contact tank and construct a tertiary treatment facility in the resulting open site at the wastewater treatment plant.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Oak Lodge Water Services District
The Board of Directors held a public meeting to discuss and take action on several items. Key topics included a public hearing and consideration of Resolution No. 2026-0048 to adopt the Fiscal Year 2027 Schedule of Rates, Fees, and Other Charges, as well as consideration of a contract with Jesse Rodriguez Construction LLC for the construction of the Lift Station 2 Inflow and Infiltration Reduction Program Phase 1 Project. The Board also reviewed Resolution No. 2026-0049 regarding budget transfers and appropriations for the fiscal year ending June 30, 2026, and received various administrative, financial, and operational department reports.
The board discussed a quarterly capital report concerning waterline replacements, risk and resiliency updates, water master plans, and wastewater plant improvements. A public hearing was held for the Fiscal Year 2026-2027 budget, leading to the adoption of a resolution for the new budget and appropriations. The management team provided departmental reports covering the hiring of a new District Recorder, financial audit updates, delinquent account reductions, and various infrastructure repair projects.
This Capital Improvement Plan for Oak Lodge Water Services outlines a six-year roadmap from Fiscal Years 2027 to 2032 to ensure continued reliable and resilient water, wastewater, and watershed protection services. The plan prioritizes projects based on critical needs, aligning them with available funding to make fiscally responsible, data-backed decisions. Key commitments include protecting public health, providing excellent customer service, making smart investments to keep rates affordable, and keeping local streams and rivers clean. The plan details financing, location, and timing of specific capital improvements across drinking water, wastewater, watershed protection, and vehicles & equipment.
The Board of Directors meeting addressed several key agenda items, including a review of the March 2026 financial report and a quarterly capital report detailing progress on various infrastructure projects such as waterline replacements, risk and resiliency updates, and wastewater collection improvements. Additionally, the Board considered and adopted Resolution 2026-047, which formalizes the fiscal year 2026-2027 budget and appropriations.
The board meeting covered several critical items, including the presentation of the FY 2023 Financial Audit and the subsequent adoption of its plan of action. The Board approved Budget Resolution No. 2026-0046, which authorizes appropriation transfers between various fund categories. Several Intergovernmental Agreements (IGAs) with Clackamas County were reviewed and approved, focusing on intra-county mutual aid and the Oatfield Rd Jennings Ave Signal Rebuild Safety Work Project. Additionally, the Board authorized the renewal of a Master Services Agreement with Convergence Networks. Other discussions included the impact of water curtailment on revenue, updates on departmental reports, and an executive session for labor negotiations and exempt records.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Oak Lodge Water Services District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge