Oaklawn Water Main Replacement RFP
Construction of the Oaklawn Water Main Replacement, including installation of a 16-inch valve and the placement of approximately 1,130 feet of 16-inch ductile iron pipe and 20 feet of 12-inch ductile iron pipe. The work includes removal of about 1,035 feet of existing 8-inch water main, installation of an altitude control valve vault (with one altitude control valve and one check valve), two fire hydrants, and associated valves, service connections, and fire hydrant connections. All work requires connections to the existing water main system and completion of all incidental items necessary for a fully operational installation.