CityPA
Posted
Sep 6, 2026
Oct 15, 2026
Bridge & Culvert Rehabilitation Phase II RFP
The project is for bridge and culvert rehabilitation at six locations. The work includes, but is not limited to, masonry cleaning and selective repointing; selective concrete replacement; inlet opening modifications; concrete underpinning; stabilization using shotcrete; scour infill with rip rap; bank stabilization; guiderail modifications and stabilization; temporary erosion and sediment control measurers; temporary stormwater bypass; and site restoration.