Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This IFB solicits contractors to abandon and demolish existing irrigation pipeline components and install a new 18" PVC pipeline including new standpipes, concrete structures, delivery gates, and air vents to replace the Booster 33/Well 22 pipeline. The Engineer's Estimate is approximately $1,935,000 and work is expected to be completed within 240 calendar days from Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construction engineering services for the district's strolling hills pipeline replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Provide construction engineering services for the district's strolling hills pipeline replacement project.
AvailablePremium
Access the largest public sector contact database
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
AvailableWork consists of installing approx 10,000 lf of sewer force main pipe. Installation of approx 10,000 lf of 20" pipe and appurtenances within county right-of-way and private roadways and within district easements. Temporary installation of a bypass pipeline to manage force main flows during construction within a 10-foot-wide easement. Replacement of an 8" waterline in the same 10-foot-wide easement and verifying that installation meets the requirements of the division of drinking water waiver.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Close: Dec 19, 2025
Work consists of installing approx 10,000 lf of sewer force main pipe. Installation of approx 10,000 lf of 20" pipe and appurtenances within county right-of-way and private roadways and within district easements. Temporary installation of a bypass pipeline to manage force main flows during construction within a 10-foot-wide easement. Replacement of an 8" waterline in the same 10-foot-wide easement and verifying that installation meets the requirements of the division of drinking water waiver.
AvailableConstruction of a 1,000 gpm Well Facility and a separate water booster station, including a 30-ft x 40-ft building, clearwell, pumps, internal piping, yard piping, chemical feed systems, electrical, instrumentation, HVAC, plumbing, related appurtenances, paving, and site restoration located
Posted Date
Nov 18, 2025
Due Date
Dec 23, 2025
Release: Nov 18, 2025
Close: Dec 23, 2025
Construction of a 1,000 gpm Well Facility and a separate water booster station, including a 30-ft x 40-ft building, clearwell, pumps, internal piping, yard piping, chemical feed systems, electrical, instrumentation, HVAC, plumbing, related appurtenances, paving, and site restoration located
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis