Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This IFB solicits contractors to abandon and demolish existing irrigation pipeline components and install a new 18" PVC pipeline including new standpipes, concrete structures, delivery gates, and air vents to replace the Booster 33/Well 22 pipeline. The Engineer's Estimate is approximately $1,935,000 and work is expected to be completed within 240 calendar days from Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction management services and materials testing services, including resident engineer, structures rep, construction engineering, construction inspection, source inspection, materials sampling and testing for a new well and pipeline project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
Work includes construction management services and materials testing services, including resident engineer, structures rep, construction engineering, construction inspection, source inspection, materials sampling and testing for a new well and pipeline project.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of water well pump replacement.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work includes construction of water well pump replacement.
AvailableDavie County Public Utilities is seeking bids for the replacement of the existing Deadmon Road Booster Pump Station, located at the intersection of Deadmon Road (SR-1801) and Turrentine Church Road (SR-1802). The project involves the construction of a new booster pump station building with two 50-horsepower centrifugal pumps, electrical work, piping, HVAC, SCADA integration, and demolition of the old station. Sealed bids will be accepted until February 19, 2026, at 10:00 AM at the Davie County Commissioner's Conference Room in Mocksville, NC.
Posted Date
Jan 13, 2026
Due Date
Feb 19, 2026
Release: Jan 13, 2026
Close: Feb 19, 2026
Davie County Public Utilities is seeking bids for the replacement of the existing Deadmon Road Booster Pump Station, located at the intersection of Deadmon Road (SR-1801) and Turrentine Church Road (SR-1802). The project involves the construction of a new booster pump station building with two 50-horsepower centrifugal pumps, electrical work, piping, HVAC, SCADA integration, and demolition of the old station. Sealed bids will be accepted until February 19, 2026, at 10:00 AM at the Davie County Commissioner's Conference Room in Mocksville, NC.
AvailableInstallation of 4,350 LF of 10", 8", 6", 4" welded steel pipe with valves, fittings, pipeline disinfection and appurtenances. 7 EA install fire hydrants, service connection, 2,210 LF 1" HDPE service pipe, 1,090 LF 8" pavement cutting, 1,260 CY trench excavation, 23,900 SF 6" AC plug permanent pavement, 44,500 SF 2" grind & overlay, 1,020 SF 4" sidewalk.
Posted Date
Jan 30, 2026
Due Date
Feb 12, 2026
Release: Jan 30, 2026
Close: Feb 12, 2026
Installation of 4,350 LF of 10", 8", 6", 4" welded steel pipe with valves, fittings, pipeline disinfection and appurtenances. 7 EA install fire hydrants, service connection, 2,210 LF 1" HDPE service pipe, 1,090 LF 8" pavement cutting, 1,260 CY trench excavation, 23,900 SF 6" AC plug permanent pavement, 44,500 SF 2" grind & overlay, 1,020 SF 4" sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →