Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 4,350 LF of 10", 8", 6", 4" welded steel pipe with valves, fittings, pipeline disinfection and appurtenances. 7 EA install fire hydrants, service connection, 2,210 LF 1" HDPE service pipe, 1,090 LF 8" pavement cutting, 1,260 CY trench excavation, 23,900 SF 6" AC plug permanent pavement, 44,500 SF 2" grind & overlay, 1,020 SF 4" sidewalk.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of loop road asphalt replacement project.
Posted Date
Jan 30, 2026
Due Date
Feb 24, 2026
Release: Jan 30, 2026
Close: Feb 24, 2026
Work consists of loop road asphalt replacement project.
AvailableRelease: Jan 8, 2026
Close: Feb 5, 2026
Structure replacement project.
Construction of water distribution system pipelines & components replacing existing water infrastructure and are as follows: approx 50,667 LF of 8" diameter water mains and 7,581 LF of 12" diameter water transfer line. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, SWPPP measures, traffic control, and related material & procedures.
Posted Date
-
Due Date
Feb 13, 2026
Close: Feb 13, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure and are as follows: approx 50,667 LF of 8" diameter water mains and 7,581 LF of 12" diameter water transfer line. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, SWPPP measures, traffic control, and related material & procedures.
Release: Jan 23, 2026
Close: Feb 20, 2026
Provide bridge replacement work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis