Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Wyoming State Construction Department
The Wyoming State Construction Department is soliciting bids to rehabilitate the boardwalk at Hot Springs State Park in Thermopolis, WY, including complete removal and reconstruction of the boardwalk, foundations/supports, guardrails, appurtenance work, and site reclamation. Bids must be submitted via Public Purchase by 1:00 p.m. Mountain Time on January 7, 2026, with a non‑mandatory pre‑bid meeting on December 4, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Florida Department of Environmental Protection
Boardwalk rehabilitation and parking lot expansion.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Florida Department of Environmental Protection
Close: Dec 11, 2025
Boardwalk rehabilitation and parking lot expansion.
AvailableCity of Memphis
Boardwalk replacement.
Posted Date
Nov 4, 2025
Due Date
Dec 3, 2025
Release: Nov 4, 2025
City of Memphis
Close: Dec 3, 2025
Boardwalk replacement.
AvailableCity of Sarasota
WWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Jan 22, 2026
Release: Nov 6, 2025
City of Sarasota
Close: Jan 22, 2026
WWTP comprehensive rehabilitation construction project.
AvailableTown of Parkton
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
Posted Date
Oct 6, 2025
Due Date
Dec 4, 2025
Release: Oct 6, 2025
Town of Parkton
Close: Dec 4, 2025
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis