Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of South Carolina - Sumter issued a solicitation for the Bluff Industrial Road Storm Sewer Outfall project to install a new cul-de-sac and driveway entrance, relocate existing jersey barriers, and perform demolition and asphalt paving in Columbia, SC. The contract includes grading and erosion-control measures with an estimated value range between $500,000 and $1,500,000. Proposals are due by February 24, 2026, and procurement documents are accessible via the buyer's official procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The University of South Carolina is soliciting bids for the Bluff Industrial Road Storm Sewer Outfall Phase B project to install a new cul-de-sac, create a new driveway entrance for an adjoining property, and relocate an existing jersey barrier. The project is being delivered via the Design-Bid-Build method with an estimated construction cost range of $91,000 to $111,000 and documents available through the USC Supplier Portal. Bids are due February 24, 2026 at 2:30 PM (EST).
Posted Date
Jan 30, 2026
Due Date
Feb 24, 2026
Release: Jan 30, 2026
Close: Feb 24, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of South Carolina is soliciting bids for the Bluff Industrial Road Storm Sewer Outfall Phase B project to install a new cul-de-sac, create a new driveway entrance for an adjoining property, and relocate an existing jersey barrier. The project is being delivered via the Design-Bid-Build method with an estimated construction cost range of $91,000 to $111,000 and documents available through the USC Supplier Portal. Bids are due February 24, 2026 at 2:30 PM (EST).
AvailableThe Waller County Municipal Utility District No. 40 is soliciting sealed bids for construction of water, sanitary sewer, and storm sewer facilities as part of the Cameron Prairie Collector Road Street Dedication project. The scope includes installation of multiple water and sewer main segments (8-, 10-, 12-inch sizes) and 24-60 inch storm piping with associated appurtenances. Bids may be submitted in-person to the Engineer (BGE, Inc.) or electronically through CivCast, with a bid opening scheduled for February 18, 2026.
Posted Date
Jan 28, 2026
Due Date
Feb 18, 2026
Release: Jan 28, 2026
Close: Feb 18, 2026
The Waller County Municipal Utility District No. 40 is soliciting sealed bids for construction of water, sanitary sewer, and storm sewer facilities as part of the Cameron Prairie Collector Road Street Dedication project. The scope includes installation of multiple water and sewer main segments (8-, 10-, 12-inch sizes) and 24-60 inch storm piping with associated appurtenances. Bids may be submitted in-person to the Engineer (BGE, Inc.) or electronically through CivCast, with a bid opening scheduled for February 18, 2026.
AvailableTo assist city staff with performing dry-weather visual outfall monitoring, collecting ms4 outfall analytical samples, and other related tasks for each monitoring year. One year term contract with the successful consultant with the option to renew the contract on annual basis not to exceed a total of three consecutive years.
Posted Date
Jan 20, 2026
Due Date
Feb 4, 2026
Release: Jan 20, 2026
Close: Feb 4, 2026
To assist city staff with performing dry-weather visual outfall monitoring, collecting ms4 outfall analytical samples, and other related tasks for each monitoring year. One year term contract with the successful consultant with the option to renew the contract on annual basis not to exceed a total of three consecutive years.
AvailableOutfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Feb 3, 2026
Release: Dec 15, 2025
Close: Feb 3, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →