Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of South Carolina is soliciting bids for the Bluff Industrial Road Storm Sewer Outfall Phase B project to install a new cul-de-sac, create a new driveway entrance for an adjoining property, and relocate an existing jersey barrier. The project is being delivered via the Design-Bid-Build method with an estimated construction cost range of $91,000 to $111,000 and documents available through the USC Supplier Portal. Bids are due February 24, 2026 at 2:30 PM (EST).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The University of South Carolina - Sumter issued a solicitation for the Bluff Industrial Road Storm Sewer Outfall project to install a new cul-de-sac and driveway entrance, relocate existing jersey barriers, and perform demolition and asphalt paving in Columbia, SC. The contract includes grading and erosion-control measures with an estimated value range between $500,000 and $1,500,000. Proposals are due by February 24, 2026, and procurement documents are accessible via the buyer's official procurement portal.
Posted Date
Jan 29, 2026
Due Date
Feb 24, 2026
Release: Jan 29, 2026
Close: Feb 24, 2026
The University of South Carolina - Sumter issued a solicitation for the Bluff Industrial Road Storm Sewer Outfall project to install a new cul-de-sac and driveway entrance, relocate existing jersey barriers, and perform demolition and asphalt paving in Columbia, SC. The contract includes grading and erosion-control measures with an estimated value range between $500,000 and $1,500,000. Proposals are due by February 24, 2026, and procurement documents are accessible via the buyer's official procurement portal.
AvailableOutfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Feb 3, 2026
Release: Dec 15, 2025
Close: Feb 3, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableProject consists of 1 LS clearing and grubbing; 108 SY pavement restoration, type a; 125 LF curb, type a (springfield cu-1); 0.70 CY concrete masonry; 2 EA manhole, type mh-3 (springfield mh-1); 356 LF 36" conduit, type b; 3 SY riprap, type d; 5 CY rock channel protection, type b with geotextile fabric; 43 CY topsoil; 386 CY seeding and mulching; 104 LB commercial fertilizer; 1 EA erosion control.
Posted Date
Jan 26, 2026
Due Date
Feb 13, 2026
Release: Jan 26, 2026
Close: Feb 13, 2026
Project consists of 1 LS clearing and grubbing; 108 SY pavement restoration, type a; 125 LF curb, type a (springfield cu-1); 0.70 CY concrete masonry; 2 EA manhole, type mh-3 (springfield mh-1); 356 LF 36" conduit, type b; 3 SY riprap, type d; 5 CY rock channel protection, type b with geotextile fabric; 43 CY topsoil; 386 CY seeding and mulching; 104 LB commercial fertilizer; 1 EA erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis