Ignacio School District 11 Joint
School DistrictCO
Posted
Sep 23, 2026
Oct 7, 2026
2009 Blue Bird Bus, 71 Passenger
Provide 2009 blue bird bus.
Description: The Fort Valley Utility Commission is soliciting sealed bids for construction of the electric primary feeder system serving the Blue Bird Expansion Project in Fort Valley, Georgia. The work includes a 7.2/12.47-kV three-phase underground distribution system, with cable and conduit, transformers, switchgear, metering, terminations, grounding, testing, and commissioning. This is a labor-only bid: the Commission supplies the major electrical materials, while the contractor supplies labor, supervision, personnel, equipment, tools, and safety items; bidders must be experienced and properly licensed.
SpecialDistrict · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Ignacio School District 11 Joint
School DistrictCO
Posted
Sep 23, 2026
Oct 7, 2026
Provide 2009 blue bird bus.
Genesee Intermediate School District
School DistrictMI
Posted
Sep 29, 2026
Oct 15, 2026
Genesee Intermediate School District (ISD) is soliciting proposals for the GCI Expansion Project. The project concerns expansion of the Genesee Career Institute, with further scope details in the bid advertisement. The solicitation is open, and proposals are due October 15, 2026.
OtherKS
Posted
Sep 18, 2026
Oct 13, 2026
Backstage Addition: a. Demolish existing paving, site prep for new addition. b. New steel frame structure with CMU and metal stud exterior wall systems. c. Exterior wall finish to be FLUTED CMU and metal wall panel d. Interior wall finish to be exposed CMU/Concrete, Gypsum wallboard, painted, typically. e. New lighting. f. New HVAC ductwork, supply and return systems, and new HVAC equipment. g. Exposed structure to be painted Education Wing (Dance Studios) New Addition a. New steel frame construction with metal stud wall construction, CMU, metal pane, and EIFS veneer. b. Concrete Foundations. c. Geopier site stabilization d. Interior walls to be metal stud and drywall construction. High STC partition types in areas. e. Ceilings include lay-in acoustical tiles and exposed structural steel slotted roof deck (acoustical). f. Carpet and porcelain tile flooring. g. TPO membrane roofing. h. Rooftop mounted HVAC equipment. i. Extension of existing fire sprinkler system to sprinkle the new addition. Miscellaneous Renovation Interior a. Partial wall removal adjacent to stage for production storage. b. Leveling of portions of the existing recessed floor with steel framing and concrete. c. Removal of existing exterior doors and enlarged openings for new rolling shutters. d. Remove existing stair at backstage area to Green Room (basement) e. New exterior stair and concrete opening at basement below stage. f. Shoring as required for existing foundation support during stair addition construction.
Port Authority of New York and New Jersey
Special DistrictNY
Posted
Sep 15, 2026
Sep 30, 2026
Bird Exclusion and Dropping Remediation Services At Newark Liberty International Airport.
Decision makers connected to this RFP from Fort Valley Utility Commission.