Closing soon

Blossom Way Sewer Main Construction

Description: The project consists of installation of approx. 15,500 LF of sanitary sewer main, ranging in size from 8" to 36" dia., with trenching depths ranging from 6' to 20'. Installation methods shall mainly be open cut, with some sections installed by auger bore or pipe bursting methods. Manholes and diversion boxes will be epoxy lined. Also includes 15 LF of 8" PVC SDR-26 sewer line 8' - 10' depth; 1003 LF of pipe bursting trenchless replacement of 8" PVC main with 12" HDPE DR17 main.

Buyer
Rogers Water Utilities

SpecialDistrict · AR, US

Released
Sep 27, 2026
Closes
Oct 14, 2026(13 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts