CityAZ
Posted
Aug 28, 2026
Oct 15, 2026
Sundog Trunk Main Sewer Phase C3
Work includes 40 EA tree removal > 12" diameter, 36980 SY subgrade preparation, 8" thick, 49510 SY asphalt chip seal, low volume w/ pmm, 147 SY asphalt concrete (ac) pavement, 3" thick, 13479 SY asphalt concrete (ac) pavement, 4" thick, 10690 LF temporary pavement striping, white (4" equivalent), 800 LF concrete curb & gutter, qcsd 220q-2, type c, 2164 SF concrete 5' sidewalk, qcsd 230q, 73 SF sidewalk termination ramp, 3695 SF 6' valley gutter & spandrels, qcsd 240q, 1552 SF concrete in roadway, 58 LF remove 6" pvc water main. See attached file.