Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Road improvement project.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Road improvement project.
AvailableThe Town of Westport seeks bids for the Compo Road South Sidewalk Improvement Project. The work generally includes construction and rehabilitation of sidewalks and related appurtenances along Compo Road South to improve pedestrian accommodations and ADA compliance. Bids are due to the Town of Westport by 11:00 AM on January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The Town of Westport seeks bids for the Compo Road South Sidewalk Improvement Project. The work generally includes construction and rehabilitation of sidewalks and related appurtenances along Compo Road South to improve pedestrian accommodations and ADA compliance. Bids are due to the Town of Westport by 11:00 AM on January 29, 2026.
AvailableRelease: Jan 23, 2026
Close: Feb 20, 2026
Provide bridge replacement work.
AvailablePennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
PennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis