Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
AvailableRelease: Nov 18, 2025
Close: Dec 12, 2025
Road improvement project.
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Close: Dec 15, 2025
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
AvailableWork includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis