Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Douglasville-Douglas County Water And Sewer Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Financial Officer
Executive Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Douglasville-Douglas County Water And Sewer Authority
Procurement of janitorial services for an approximately 30,000 square foot administration building for a two-year period.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Douglasville-Douglas County Water And Sewer Authority
Close: Jan 28, 2026
Procurement of janitorial services for an approximately 30,000 square foot administration building for a two-year period.
AvailableDouglasville-Douglas County Water And Sewer Authority
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Douglasville-Douglas County Water And Sewer Authority
Close: Jan 14, 2026
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Douglasville-Douglas County Water And Sewer Authority
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Douglasville-Douglas County Water And Sewer Authority
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.