Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of South Lake Tahoe is soliciting bids for the Bijou Park Connector Trail, a public works construction project including demolition, traffic control, construction staking, a Class 1 trail, ADA-compliant curb ramps, RRFB installation, signage/striping, HDPE pipe, BMPs, vegetation restoration, and other tasks per the contract documents. The solicitation was posted Jan 16, 2026 and bids are due Feb 13, 2026 at 1:00 PM PST; the response format is paper and the contract is a lump-sum public works bid. A hybrid pre-bid meeting is scheduled for Jan 28, 2026 at 10:00 AM PST (onsite at 1740 D St, South Lake Tahoe, CA and via Microsoft Teams).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes connector trail.
AvailableProvide Kiwanis Park Trail and Constructed wetlands Project.
Posted Date
Dec 15, 2025
Due Date
Jan 28, 2026
Release: Dec 15, 2025
Close: Jan 28, 2026
Provide Kiwanis Park Trail and Constructed wetlands Project.
AvailableThe Project consists of 2” of 9.5mm by 5.5’ of asphalt on the walking trail at Park.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Project consists of 2” of 9.5mm by 5.5’ of asphalt on the walking trail at Park.
AvailableThe Work consists of constructing the Park segment of the Fall Line Trail. The work will be approximately a 1.1 mile long, 12 feet wide shared-use path, extending from the intersection. Work includes approx. 1 LS mobilization, 313 TN asphalt concrete, 459 SY 4" concrete sidewalk, 12 LF handrail, 538 LF 18" storm sewer pipe, 14 LF manhole, 255 LB structural steel, 325 LF 1" water service line, 32 LF 4" DI water main, 5 EA fire hydrant, 11 EA adjust existing valve & box, 8 EA 5/8" water meter box & yoke, 6 LF 6" sanitary service later connection, pavement marking, signage, 222 LF 2" bored conduit, 15 LF 2" PVC conduit, 1 EA lighting pole, 1 LS clearing & grubbing, 337 LB overseeding, 15,216 SY hydraulic erosion control, 152 LB fertilizer nitrogen - N.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
The Work consists of constructing the Park segment of the Fall Line Trail. The work will be approximately a 1.1 mile long, 12 feet wide shared-use path, extending from the intersection. Work includes approx. 1 LS mobilization, 313 TN asphalt concrete, 459 SY 4" concrete sidewalk, 12 LF handrail, 538 LF 18" storm sewer pipe, 14 LF manhole, 255 LB structural steel, 325 LF 1" water service line, 32 LF 4" DI water main, 5 EA fire hydrant, 11 EA adjust existing valve & box, 8 EA 5/8" water meter box & yoke, 6 LF 6" sanitary service later connection, pavement marking, signage, 222 LF 2" bored conduit, 15 LF 2" PVC conduit, 1 EA lighting pole, 1 LS clearing & grubbing, 337 LB overseeding, 15,216 SY hydraulic erosion control, 152 LB fertilizer nitrogen - N.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →