CityAL
Posted
-
Sep 30, 2026
Bid # 26-013 Glenwood Road Storm Sewer System Improvements
Procurement of labor, materials, and equipment for Glenwood Road Storm Sewer System Improvements.
Description: This RFP is for the procurement of improvements for the FY 2024 NJDOT Trust Fund Improvements Princess Road Connectivity Improvements, including 15,318 SY HMA milling, 1760 Tons 9.5M64 surface course, 747 SY concrete sidewalk, and 1178 LF concrete curb.
City · NJ, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityAL
Posted
-
Sep 30, 2026
Procurement of labor, materials, and equipment for Glenwood Road Storm Sewer System Improvements.
CityNJ
Posted
Jul 5, 2026
Sep 29, 2026
Project consists of two (2) Base Bids and two (2) Alternate Bids that consist of sidewalk and roadway improvements. Base Bid ‘A' includes milling and paving of asphalt sidewalk, full depth pavement repair, construction of accessible curb ramps, concrete sidewalk, concrete vertical drainage improvements, topsoil restoration, and all other improvements shown within the Construction Plans. Base Bid ‘B' includes milling and paving of roadway, full depth pavement repair, concrete sidewalk, concrete vertical and sloped curb, drainage improvements, striping, and all other improvements shown within the Construction Plans. Alternate Bid ‘AA' includes additional tinted stamped concrete sidewalk paths, illuminated bollards, topsoil restoration, and all other improvements shown within the Construction Plans. Alternate Bid ‘AB' includes additional milling and paving of asphalt sidewalk.
Posted
Sep 9, 2026
Sep 30, 2026
Project consists of improvements to two (2) intersections and improvements. Work shall also include road reconstruction, HMA milling and paving, full depth pavement repair, grading and drainage improvements, installation of granite block curb, driveway repairs, concrete sidewalk repairs, construction of ADA curb ramps, site restoration and all other improvements depicted within the Bid Documents.
CountyNE
Posted
Aug 22, 2026
Sep 24, 2026
Project includes earthwork, cold milling, furnishing and placing approx 9,800 tons of asphaltic concrete, earth shoulder construction, seeding and other associated items.
Decision makers connected to this RFP from Township of Lawrence.