Higher EducationMI
Posted
Nov 13, 2026
Dec 9, 2026
CW Lockdown Project RFP
Complete the campus wide lockdown project. This is a campus wide project that is poised to increase security across the campus at all buildings. Existing doors that are not currently equipped with security lock down devices will have them installed. Exterior entrance doors or frames that are in poor condition will be repaired or replaced. Minor patch and repair work may be necessary depending on door location, and accessibility to power for electronic hardware. New electrical power feeds will be installed to doors currently devoid of power.
