Higher EducationNC
Posted
-
Sep 22, 2026
Main Steam Line Replacement and Vault Access RFP
Construction services for Main Steam Line Replacement and Vault Access.
Description: The Contractor shall remove the granite globe (for reuse), from the fountain base stone using a crane and an appropriate ball sling to support the 20,000 lb. globe. The granite globe shall be placed on a wooden crib support. Crib shall be custom built to allow 1/3 of the globe to rest in the cradle. Cradle shall be lined with one (1) inch foam iso board for cushioning. The Contractor shall provide and install a concrete slab as the foundation for the mechanical vault. The concrete slab shall measure seven (7) foot by ten (10) foot by six (6) inches thick and shall be reenforced with ¼ inch welded wire. The Contractor shall secure the vault with 5/8 wedge anchor bolts to the slab. The Contractor shall supply and install a new mechanical vault and components. The Contractor shall use the excavated area to install the new vault to house mechanical and electrical. This area shall be excavated to accommodate a larger vault if necessary. Excavation shall exceed the size of the vault by three (3) feet on at least two (2) sides to allow plumbing and electrical connections to the new vault. Caution shall be taken to connect any subterranean drainage around the base of the vault. New vault shall have at least one (1) foot topsoil cover, if necessary, a vault hatch extension may be necessary to extend hatch opening to one foot above grade. Hatch door shall have a keyed lock handle for entry. Hatch door shall also have assist cylinder to assist in opening, it shall also be equipped with a manual lock open device that must be manually operated to close hatch door. There shall be a door switch to activate light and fan upon door being opened.
StateAgency · TN, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Tennessee Wildlife Resources Agency.
These related opportunities are still open for bidding.
Higher EducationNC
Posted
-
Sep 22, 2026
Construction services for Main Steam Line Replacement and Vault Access.
Tennessee Department of Environment and Conservation
State AgencyTN
Posted
Aug 31, 2026
Oct 1, 2026
Contractor will furnish necessary materials, equipment, and labor to perform park grounds and maintenance tasks at Mall State Park.
Posted
Aug 28, 2026
Sep 28, 2026
The U.S. Army Corps of Engineers, Baltimore District is seeking small-business sources for a potential firm-fixed-price contract to provide vault pumping services at Jennings Randolph Lake near Elk Garden, West Virginia. The work includes scheduled and emergency removal and off-site disposal of raw sewage from vault latrines, together with delivery and servicing of portable toilets. The notice is an active Sources Sought market-research notice—not an RFP/RFQ/IFB or grant—and responses are due Sep 28, 2026 02:00 pm EDT; it anticipates a base year starting on or about January 1, 2027, followed by four one-year options.
Virginia Commercial Space Flight Authority
State AgencyVA
Posted
Aug 21, 2026
Sep 18, 2026
Virginia Commercial Space Flight Authority is soliciting proposals from qualified firms to design, procure, and retrofit a 20-foot ISO tunnel container into a Launch Equipment Vault at Wallops Island, Virginia. The work includes all labor, materials, equipment, tools, supervision, transportation, fees, bonds, warranties, engineering design, fabrication, installation, and verification required for the project. This is an open Request for Proposals rather than a grant program, and proposals are due September 18, 2026, at 4:00 PM.