CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Central Resort District Drainage Improvements Phase 1 Design Build Project (Request For Proposal)
Design-Build: work includes central resort district drainage improvements.
Description: Provide bi-directional amplifier program - design-build - phase one.
SchoolDistrict · SC, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Design-Build: work includes central resort district drainage improvements.
CityWY
Posted
Jul 31, 2026
Sep 16, 2026
Seeking from qualified Design-Build Contractor to provide engineering, design, construction administration, construction, and installation services.
School DistrictVA
Posted
Sep 3, 2026
Oct 2, 2026
DESIGN-BUILD construction of a 28' x 60' x 10' post-steel dressing room/restroom building. Work includes site preparation, stone base, a 4" 4,000 psi concrete slab with reinforcing wire, seamless gutters with downspouts, 3" insulation in roof and walls, 1 set of insulated double doors, 5 3' x 6'8" HD insulated walk doors, 2 concession style roll up doors, and 3 rough plumbing connections for single user restrooms.
CityFL
Posted
Aug 11, 2026
Sep 21, 2026
Design-Build services splash pad.
Decision makers connected to this RFP from Greenville County School District.