CityMN
Posted
-
Oct 29, 2026
Well No. 7 Watermain Extension
1 ea - hydrant; 3 ea - 6", 12" and 24" gate valve and box; 655 LF - 6" to 24" watermain (DIP and PVC); 1100 LBS - ductile iron fittings.
Description: The work for which bids are asked includes the following estimated quantities: 9,000 LF of water main (6" thru 16" PVC) by both open trench (8,400 LF, 6" thru 16" PVC) and horizontal boring (600 LF, 16" Fusible PVC or HDPE); 25,000 S.Y. topsoil and seeding/erosion matting; driveway culvert and material restoration; as well as all related work including unclassified excavation, erosion control, and traffic control.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMN
Posted
-
Oct 29, 2026
1 ea - hydrant; 3 ea - 6", 12" and 24" gate valve and box; 655 LF - 6" to 24" watermain (DIP and PVC); 1100 LBS - ductile iron fittings.
CityWI
Posted
Oct 5, 2026
Nov 5, 2026
The work under consist of excavation common, culvert pipe, storm sewer, base aggregate, pulverizing, asphalt surface, curb and gutter, erosion control and restoration, traffic control and all incidental items.
CityNL
Posted
-
Oct 9, 2026
The City of St. John's seeks qualified contractors to replace approximately 160 meters of cast-iron watermain along Shea Street. The work is a construction tender, submissions are online only, and the posting identifies the Canadian Free Trade Agreement (CFTA) as applicable. The open solicitation closes October 9, 2026 at 2:30 p.m. Newfoundland Daylight Time.
Posted
Oct 7, 2026
Oct 21, 2026
This pre-solicitation notice concerns a planned small-business-set-aside request for proposals to replace excitation systems at Beaver Dam in Carroll County, Arkansas. The work calls for designing, removing, installing and testing two digital static excitation systems, including their power potential transformers. The planned firm-fixed-price construction contract will use a best-value trade-off evaluation, and the notice specifies completion within 515 calendar days.
Decision makers connected to this RFP from City of Beaver Dam.