Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Lino Lakes
Bid Package No. 1 consists of cast-in-place concrete, precast wall panels & precast plank, structural steel materials and structural steel erection.
Posted Date
Feb 10, 2026
Due Date
Mar 13, 2026
Release: Feb 10, 2026
City of Lino Lakes
Close: Mar 13, 2026
Bid Package No. 1 consists of cast-in-place concrete, precast wall panels & precast plank, structural steel materials and structural steel erection.
City of Lino Lakes
The project work scope consists of a new public works facility for the City of Lino Lakes. Bid Package No. 2 consists of Building Demolition, Earthwork, Utilities, Site furnishings, MEPs, and interior and exterior finishes.
Posted Date
Mar 30, 2026
Due Date
Apr 20, 2026
Release: Mar 30, 2026
City of Lino Lakes
Close: Apr 20, 2026
The project work scope consists of a new public works facility for the City of Lino Lakes. Bid Package No. 2 consists of Building Demolition, Earthwork, Utilities, Site furnishings, MEPs, and interior and exterior finishes.
AvailableCity of Lino Lakes
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: Mill and Overlay Improvements 34,000 S Y Mill Bituminous Surface (1.5") 2,000 L F Remove and Replace Concrete Curb and Gutter 3,500 TON Bituminous Pavement (All Types) 70 EACH Adjust Frame & Ring Casting 5 EACH Gate Valve Bolt Replacement (8"-16") 6 EACH Remove and Replace Gate Valve (8"-16") 30 L F 8"-16" DIP Watermain Mill and Overlay Improvements (Bid Alternate) 5,500 S Y Mill Bituminous Surface (1.5") 1 EACH Remove Gate Valve 200 L F Remove and Replace Concrete Curb and Gutter 650 TON Bituminous Pavement (All Types) 10 EACH Adjust Frame & Ring Casting 1 EACH Gate Valve Bolt Replacement (8") 10 L F 8" DIP Watermain
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
City of Lino Lakes
Close: Jan 29, 2026
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: Mill and Overlay Improvements 34,000 S Y Mill Bituminous Surface (1.5") 2,000 L F Remove and Replace Concrete Curb and Gutter 3,500 TON Bituminous Pavement (All Types) 70 EACH Adjust Frame & Ring Casting 5 EACH Gate Valve Bolt Replacement (8"-16") 6 EACH Remove and Replace Gate Valve (8"-16") 30 L F 8"-16" DIP Watermain Mill and Overlay Improvements (Bid Alternate) 5,500 S Y Mill Bituminous Surface (1.5") 1 EACH Remove Gate Valve 200 L F Remove and Replace Concrete Curb and Gutter 650 TON Bituminous Pavement (All Types) 10 EACH Adjust Frame & Ring Casting 1 EACH Gate Valve Bolt Replacement (8") 10 L F 8" DIP Watermain
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; redirect to a cooperative contract.
Coops: Lead with CPV, Sourcewell, or OMNIA to bypass formal bidding. Ask procurement to confirm piggyback eligibility.
City of Lino Lakes: No public evidence or policy supporting sole source awards.
Track City of Lino Lakes's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database