CityWI
Aug 4, 2026
Closes
Aug 18, 2026
2026 Sewer Lining
Project consist of approx 820 FT CIPP, sewer service reinstatement and protruding service repair.
Description: 190 LF - 6" sanitary sewer lining; 8,873 LF - 8" sanitary sewer lining; 259 LF - 10" sanitary sewer lining.
City · MN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityWI
Aug 4, 2026
Closes
Aug 18, 2026
Project consist of approx 820 FT CIPP, sewer service reinstatement and protruding service repair.
CityMN
Aug 10, 2026
Closes
Aug 25, 2026
Project work consists of; mobilization, lining of 7000 LF of 15" sanitary sewer lining, turf establishment and erosion control.
CityIL
Jul 30, 2026
Closes
Aug 17, 2026
Work includes 175 EA reinstating service line connections; 8,195 EA full-length sewer liner (8"); 885 LF full-length sewer liner (10"); 172 LF full-length sewer liner (6"); 18 EA shorty t-liners 8" x 4" or 6" x 8'; 1 EA shorty t-liners 6" x 4" or 6" x 8'; 2 EA shorty t-liners 10" x 8" or 6" x 8'; 172 LF cleaning and inspection sewer main (6"); 8,195 LF cleaning and inspection sewer main (8"); 885 LF cleaning and inspection sewer main (10"); 21 EA 11 lateral cleaning and televising (4") (6").
Special DistrictTX
Jul 17, 2026
Closes
Aug 27, 2026
This project involves the replacement of approx 15,750 LF of 8" through 24" transmission waterlines, including a 48" magnetic flow meter, valves, fittings, and associated appurtenances with trenchless installation at designated crossings.
Procurement and program contacts connected to City of Bayport.