Description: Sealed bids are requested for repair work on four bridges and replacement of a low water crossing in Barry County, Missouri. Scope includes installation of concrete toe walls and paving, corrugated metal pipe and rock blanket for the low water crossing, and clearing, concrete collars, substructure repairs and rock blanket installation for the bridges. Plans and specifications must be purchased from Great River Engineering and bidders must meet MoDOT qualified contractor and prevailing wage requirements.
County · MO, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Barry County.
Adjacent opportunities open for bidding right now.
CountyMO
Posted
Mar 17, 2026
Dec 10, 2026
This project includes repair plans for four bridges throughout county and a low water crossing replacement. Low water crossing replacement work includes installation of concrete toe walls and paving, installation of corrugated metal pipe and rock blanket. Planned work for bridge repairs generally consists of clearing and grubbing of existing overgrown foliage, concrete collars around existing abutments, formed and unformed substructure repairs, and installation of rock blanket.
CountyVA
Posted
Oct 23, 2026
Dec 17, 2026
The Powhite Bridge Bundle (Project) consists of work from two construction plan sets: Powhite Parkway Over Tomahawk Creek and Watermill overpass of Powhite Parkway. Combined, the projects will: Construct approx. 4120’ of the Powhite Parkway extension from east of Little Tomahawk Creek to the project limits of the Woolridge Widening Bundle Project west of Tomahawk Creek. A Shared Use Path will be constructed along the NB Powhite Parkway Lanes. Reconfigure the existing Old Hundred Road and Watermill Parkway intersection and construct 2410’ of roadway improvements along Watermill Parkway from south of Windmill Ridge Drive to south of Center Pointe Parkway. A sidewalk will be installed along the west and east side of the roadway. A sidewalk connection will be installed to tie into the Shared Use Path that is part of the Powhite Over Tomahawk construction plan set. Construct two 874’ long bridges over Tomahawk Creek and approach roadways. Construct a 159’ long bridge on Watermill Parkway over Powhite Parkway and approach roadways.
Iowa Department of Transportation
State AgencyIA
Posted
Nov 19, 2026
Dec 15, 2026
The project calls for repairing bridge beam ends. It includes applying a sealer coat to prestressed-concrete beam ends. The work also includes mobilization and traffic control with portable dynamic message signs.