Auto Sampling Flushing Station Installation
Work includes 1 LS construct water service connections; 142 LF construct 6" diameter pvc astm d-3034, sdr 26 drain line by open cut installed in trench, water line, complete in place, all depths, including fittings, embedment, backfill, thrust blocking, surface restoration, sodding/seeding, testing, all appurtenances; 3 EA construct concrete slabs complete-in-place at each site for supporting the auto flusher sampling station equipment. The concrete slab will be 6" thick, 5' long, and 4' wide with #4 rebar at 18" center- on-center each way. Work includes excavation, fill, subgrade compaction, backfill, surface restoration, sodding, testing, forming, reinforcement, concrete. See attached file.