Open RFPAuburn 2027 Street Reconstruction Project
Description: S. Cedar Street – 10th Street to 15th Street Project consists of total street reconstruction, including removal and replacement of existing asphalt pavement, with section of 6 inches of asphalt on 12 inches limestone base, complete removal and replacement of concrete curb and gutter, including perforated flex underdrain. Removal and replacement of existing sidewalks, ADA curb ramps with detectable dome plates, driveway approach, pavement markings, and all grass restoration.
Virginia Lane – Portage Pass to 550' north of Timber Trace
Project consists of total street reconstruction, including removal of existing concrete pavement, replaced with 6 inches of asphalt on 12 inches of limestone base, partial curb and gutter removal and replacement, along with perforated flex underdrains for entire project length.