South Dakota Bureau of Administration
State AgencySD
Aug 11, 2026
Closes
Aug 25, 2026
Boat Ramp Replacement RFP
Boat Ramp Replacement.
Description: The Iowa Department of Administrative Services (DAS) is soliciting bids for the removal and replacement of the will call ramp, its accessories, and the surrounding area at the Alcohol & Tax Operations Division (ATOD) facility in Ankeny, Iowa. The work scope includes demolition, excavation, site restoration, new concrete forming/reinforcing/cast-in-place concrete, and related metal fabrications (rails, stairs, etc.). Bids must be submitted via the IMPACS Electronic Procurement System by 2:00 PM local time on July 28, 2026, with a virtual bid opening (Microsoft Teams) scheduled at 3:00 PM that day.
StateAgency · IA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
South Dakota Bureau of Administration
State AgencySD
Aug 11, 2026
Closes
Aug 25, 2026
Boat Ramp Replacement.
CityOH
Aug 3, 2026
Closes
Aug 18, 2026
Work includes replacement of 64 curb ramps; 5,855 SF of walk removal; 11 LF of curb and gutter removal; 613 LF of curb removal; 10 CY of pavement repair; 2,752 SF of 4" concrete walk; 3,010 SF of 6" curb ramp; 11 LF of combination curb and gutter, type 2 (modified); 729 LF of curb, type 6; 240 LF of curb, type 7,as per plan; removal of pavement marking; 26' of stop line; 762' of crosswalk line; maintaining traffic; seeding and mulching.
U.S. Fish and Wildlife Service
FederalDC
Jun 18, 2026
Closes
Aug 14, 2026
Boat Ramp Project. Demolish and replace three (3) deteriorated concrete boat ramps at Kirwin National Wildlife Refuge. A high percentage of refuge visitation comes from the utilization of the boat ramps for authorized recreational activities, primarily hunting and fishing. The rehab of these boat ramps will improve public safety, enhance protection of refuge and visitor property, and reduce long-term maintenance costs. They will be designed to accommodate modern vehicles and trailers, support increased loads, and comply with current design standards for boat ramp construction. The ramps will be replaced with two (2) double-lane concrete boat ramps. Each lane will be separated with a median with space for a steel boat dock (30 ft x 6 ft). There are two (2) concrete boat docks (bulkheads), one at the North Shore (620 sq ft) that is part of the North Shore boat ramp structure, and one at the South Shore (870 sq ft), which need to be demolished as well. The bulkhead at the North Shore should be treated as part of the North Shore Boat Ramp structure. The wave breaks at both boat ramp locations need to be extended, reinforced, and potentially moved altogether.
CitySD
Aug 5, 2026
Closes
Aug 19, 2026
Labor only to replace the existing handicap-accessible ramp.
Procurement and program contacts connected to Iowa Department of Administrative Services.