Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a General Contractor for the Ashburn Lake Pond Enhancements project, which includes removing accumulated sediment, installing a forebay and aquatic bench, removing an island, replacing an asphalt trail, enhancing the access road, and performing site restoration and landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide lake, pond and lagoon management program.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Provide lake, pond and lagoon management program.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will involve removing, hauling, and disposing of accumulated sediment from the pond, installing two (2) forebays at existing inflows to the pond, and installing one (1) aquatic bench with breaks for public use. The project will also include the replacement of existing asphalt trails, if any, destroyed by the project, restoring the site, and implementing landscaping.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The project will involve removing, hauling, and disposing of accumulated sediment from the pond, installing two (2) forebays at existing inflows to the pond, and installing one (1) aquatic bench with breaks for public use. The project will also include the replacement of existing asphalt trails, if any, destroyed by the project, restoring the site, and implementing landscaping.
AvailableInstallation of village gateway signage, decorative corridor monument signage, wayfinding signage, pedestrian experience enhancements such as benches, bicycle racks, additional trees w/grates, and enhanced pedestrian crossings. In addition to this, the removal replacement of deteriorated miscellaneous curb, sidewalk, and driveways, along with the milling and resurfacing of certain intersections comprised of hot-mix asphalt pavements; pavement markings; landscaping restoration of disturbed areas, and other related work.
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
Installation of village gateway signage, decorative corridor monument signage, wayfinding signage, pedestrian experience enhancements such as benches, bicycle racks, additional trees w/grates, and enhanced pedestrian crossings. In addition to this, the removal replacement of deteriorated miscellaneous curb, sidewalk, and driveways, along with the milling and resurfacing of certain intersections comprised of hot-mix asphalt pavements; pavement markings; landscaping restoration of disturbed areas, and other related work.
AvailableProvision of lighting enhancements at park.
Posted Date
Jan 6, 2026
Due Date
Feb 6, 2026
Release: Jan 6, 2026
Close: Feb 6, 2026
Provision of lighting enhancements at park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →