Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water plant improvements including filter rehabilitation, clarifier rehabilitation, filter and backwash piping, new filter transfer and backwash pumps, new chlorination building and general site drainage improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableWork consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Work consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
AvailableThe project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
AvailablePreliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
Posted Date
Jan 13, 2026
Due Date
Mar 31, 2026
Release: Jan 13, 2026
Close: Mar 31, 2026
Preliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →