Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableThis project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableWork includes furnishing materials and equipment for the gravity sand filters, supply, start-up, commissioning performance testing, and operator training of the proposed filter equipment.
Posted Date
Jan 1, 2026
Due Date
Jan 6, 2026
Release: Jan 1, 2026
Close: Jan 6, 2026
Work includes furnishing materials and equipment for the gravity sand filters, supply, start-up, commissioning performance testing, and operator training of the proposed filter equipment.
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis