Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Preliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for the removal, rebuild, and reinstallation of a clarifier drive at the City of Douglas Wastewater Treatment Plant.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
Procurement of services for the removal, rebuild, and reinstallation of a clarifier drive at the City of Douglas Wastewater Treatment Plant.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 11, 2026
Release: Dec 18, 2025
Close: Feb 11, 2026
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
AvailableProcurement of services for the removal, rebuild, and reinstallation of the Wastewater Treatment Plant Clarifier Drive.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
Procurement of services for the removal, rebuild, and reinstallation of the Wastewater Treatment Plant Clarifier Drive.
AvailableThis project consists of the removal, off-site rebuild, and reinstallation of the existing clarifier drive at the Wastewater Treatment Plant (WWTP). Work includes providing structural support for clarifier components, performing safe disassembly, transporting the drive to a qualified facility, completing a full rebuild, reinstalling the refurbished unit, conducting testing and verification, and completing final site cleanup.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
This project consists of the removal, off-site rebuild, and reinstallation of the existing clarifier drive at the Wastewater Treatment Plant (WWTP). Work includes providing structural support for clarifier components, performing safe disassembly, transporting the drive to a qualified facility, completing a full rebuild, reinstalling the refurbished unit, conducting testing and verification, and completing final site cleanup.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →