Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
(4) model DE4300 – 0306-015.0 Armstrong pumps with pre-fabricated inlet/outlet piping and integrated variable speed controls. (4) model DE4300 – 0306-015.0 Armstrong pumps with pre-fabricated 4" inlet/outlet piping with roll groove connections to match existing piping, integrated VFD controls, valves and connections. All-inclusive removal and installation of new Armstrong pumps, piping, VFD controls, valves, and connections. Warranty to start after final installation check, test and start, and owner sign off that the units.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Texas Southmost College (TSC) is soliciting proposals for replacement of chilled and hot water piping systems at its campus, including removal and replacement of existing chilled and hot water piping to ensure efficient operation and compliance with applicable codes. The solicitation (RFP 26-06) posts specifications, drawings, and required response templates on the TSC Bonfire portal, and includes a non-mandatory pre-proposal conference and an in-person bid opening. Questions are due 2026-01-08 and proposals are due 2026-01-14.
Posted Date
Dec 20, 2025
Due Date
Jan 14, 2026
Release: Dec 20, 2025
Close: Jan 14, 2026
Texas Southmost College (TSC) is soliciting proposals for replacement of chilled and hot water piping systems at its campus, including removal and replacement of existing chilled and hot water piping to ensure efficient operation and compliance with applicable codes. The solicitation (RFP 26-06) posts specifications, drawings, and required response templates on the TSC Bonfire portal, and includes a non-mandatory pre-proposal conference and an in-person bid opening. Questions are due 2026-01-08 and proposals are due 2026-01-14.
AvailableClark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
Posted Date
Oct 8, 2025
Due Date
Apr 30, 2026
Release: Oct 8, 2025
Close: Apr 30, 2026
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
Work includes construction of water well pump replacement.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work includes construction of water well pump replacement.
AvailableThis RFP is for the construction of water well pump replacement in Yazoo County.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This RFP is for the construction of water well pump replacement in Yazoo County.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis