Open RFP

Arkema Interim Action - Phase 1

Description: Containment wall: Construct a continuous wall with a self-hardening slurry consisting of a mixture of ground granulated blast furnace slag, select clay, and water to form a low permeability barrier to contain groundwater; and key wall into the second site aquitard by vibrating beam methods. Site preparation and wall area capping: Perform site preparation, excavation, fill, grading, demolition, surcharge, and temp work prior to containment wall installation; and place an impervious cap over the wall area after installation. Stormwater conveyance improvements: Construct one new 30” outfall and modify one existing 36” outfall including piping, vaults, headwalls, steel piling installation, check valves, and cofferdams; and install a collection and conveyance system to connect the wall cap area to new and existing outfalls.

Buyer
Port Of Tacoma

SpecialDistrict · WA, US

Released
-
Closes
Sep 10, 2026(15 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts