Arkansas Department of Human Services
State AgencyAR
-
Closes
Sep 10, 2026
Arkadelphia Human Development Center Wastewater System Upgrades RFP
Procurement of services for wastewater system upgrades for the Arkadelphia Human Development Center.
Description: Provide wastewater system upgrades.
StateAgency · AR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Arkansas Department of Human Services
State AgencyAR
-
Closes
Sep 10, 2026
Procurement of services for wastewater system upgrades for the Arkadelphia Human Development Center.
CitySD
Aug 13, 2026
Closes
Sep 3, 2026
Project consists of construction of a fine screen building with one (1) fine screen, preliminary effluent pumping, and associated mechanical and electrical (FSB). Construction of one (1) oxidation ditch splitter structure (ODS). Construction of one (1) aerobic oxidation ditch with mechanical surface aeration and an adjacent drain lift station (OD1). Installation of a plant reuse water system in the existing Disinfection System Building with associated site piping. Construction of an electrical building to serve power to the new FSB, OD1, and space for future loads. Construction of related yard piping, site work improvements, mechanical, electrical, and instrumentation/controls to facilitate the improvements. Construction of a drain lift station intake from the existing Cell 1 lagoon pond. Selective demolition to accommodate the construction of above facilities. Integration of all new and modified facilities into the existing and/or new plant control system, including all required PLC programming, HMI configuration and programming, communications setup, testing, troubleshooting, and commissioning necessary to achieve fully functional operation of the improvements.
CityWA
-
Closes
Sep 16, 2026
The City of Harrington is soliciting sealed bids for upgrades to its wastewater treatment plant. The work includes installing a new micro strainer, modifying the return weir, and providing the labor, equipment, transportation, supervision, materials, and incidentals needed to complete the improvements. The estimated project cost is $1,000,000 - $1,200,000, and the project is partially funded through the Washington State Community Development Block Grant program with federal funds from the U.S. Department of Housing and Urban Development.
CityNY
Jul 31, 2026
Closes
Sep 18, 2026
Upgrades to the WWTP, including upgrades to the existing headworks system, new sequencing batch reactor, new sludge holding tanks, new flow equalization tanks and associated pump station, conversion of existing effluent pump station to re-aeration tank, renovations to an existing operation/control building, new UV disinfection system, new sludge processing equipment, miscellaneous architectural upgrades, yard piping, site work and appurtenances.
Decision makers connected to this RFP from Arkansas Division of Building Authority.