CityWA
Aug 5, 2026
Closes
Aug 20, 2026
6th Street Sidewalk Improvements
Work includes 700 CY unclassified excavation including hauling; 2 EA landscape swale and infiltration trench; 700 TON crushed surfacing base course; 250 TON HMA cl 3/8" pg 64h-28; 70 LF storm seweer pipe 12" dia; 2 EA concrete curb inlet; 2 EA cathch basin type 2 48" dia; 2 EA concrete curb inlet; 2 EA cath basin type 2 48" dia. See attached file.